Return to Project List

Click the image for more detail

The Adaptive Reuse of Soldier Field

LOCATION: Chicago, IL
COUNTRY:  USA
ARCHITECT: Wood & Zapata, Inc.; Lohan Associates
ENGINEER: Thorton Tomesetti Engineers
DEVELOPER/CLIENT: Turner/Barton Malow/Kenny Joint Venture
BUILDER:  TBMK
SIZE OF CLADDING: 190,000 sqf (17,650 sqm) curtain wall encompassing three distinct areas (Sqf curtain wall) (Sloped Wall / Suite Section / Screen Walls)
PROJECT'S FEATURE: A challenging geometric design encompassing nine different radii within a half oval section of the new stadium. Scheduled to open the Fall of 2003.

DESCRIPTION: As part of the Chicago Lakefront Improvement Plan, this stadium project for the Chicago Bears contains a sloped glazing curtain wall system with laminated tinted glass, stainless steel covers and shadow boxes, a suite section with operable windows (up to 4 sqm) and a decorative screen wall with custom silk screening.

SPECIAL REMARKS: Joint Venture with Josef Gartner USA


Project Photo Archive

Click on a photo to view a larger image.


 

 

 

 

Return to Project List




  © Copyright 2001-2008 Permasteelisa North America All rights reserved in all media.